Loading…
Loading…
13 results • Latest
Providing Street Light arrangements for the Work of Construction of ROB in Lieu of Existing LC No 47 in between Guduvancherry and SingaperumalKoil Railway Stations
Formation of New Six lane road from Vengathur Design Chainage Ch 58200 to Sengadu Design Chainage Ch 68200 with paved shoulders and two lane service road on both sides in Section III of Chennai Peripheral Ring Road Project under Package EPC 04
Formation of New Six lane road from Thiruvallur Bypass Design Chainage Ch 47800 to Vengathur Design Chainage Ch 58200 with paved shoulders and two lane service road on both sides in Section III of Chennai Peripheral Ring Road Project EPC03
Formation of New Six lane road from Sengadu Design Chainage 68200 to Sriperumbudur Design Chainage 77900 with paved shoulders and two lane service road on both sides in Section III of Chennai Peripheral Ring Road Project under Package EPC 05
Restoration of Road cut for laying of Gas Pipe line in Singaperumalkoil to Sriperumbudur Road from Km 10/200 to 12/800 RHS
Shifting and conversion of HT/LT OH Lines due to construction of Grade Separator in Vandalur to Walajabad Road between 37/6 Km to 38/6 Km
Preparation of Detailed Project Report for Upgradation of Section-IV of Chennai Peripheral Ring Road from Sriperumpudur to Singaperumalkoil km 77/9 to 101/7
Environmental and Social External Monitoring Consultancy for Chennai Peripheral Ring Section II and III
Formation of New Six lane road from Punnapakkam Design Chainage Ch 35000 to Thiruvallur Bypass Design Chainage Ch 47800 with paved shoulders and two lane service road on both sides in Section2 of Chennai Peripheral Ring Road Project under
Construction of ROB in lieu of Existing LC-No.47 in between Guduvancherry and Singaperumalkoil Railway Stations