Loading…
Loading…
30 results • Recent activity
Supply and installation of street light poles with 150w LED fittings including supply and laying of HDPE Pipe UG cables Supply and erection of Metering Panels Control panels at the stretches handed over by CMRL Km8.795 to9.510 Km10.000 to11.900 OMR
Strengthening Improvement of main carriageway and Relaying of service road including divider kerb wall and replacing the damaged manhole cover slabs with new cover slabs from Km 4.070 to 4.300, 4.970 to 5.380 and 5.800 to 5.950 (LHS and RHS) of OMR
Strengthening Improvement of main Carriageway and Relaying of service road including divider kerb wall and replacing the damaged manhole cover slabs with new cover slabs from Km 6.100 to 6.490, 9.380 to 9.510, 11.100 to 11.350 (LHS and RHS) of OMR
Resurfacing including milling of BT surface of selected stretches in East Coast Road from Akkarai to Uthandi LHS 2.00km Ch 22.300 to 24.300, RHS 1.00km Ch 22.300 to 23.300
Carrying out road cleaning work from km 38.000 to 52.900 (Vada Nemmeli to Mahabalipuram) on both sides including service road foot path and junction attending patch works and Vegetation removal at East Coast Road (ECR) for one year
Carrying out road cleaning work from km 22.300 to 38.000 (Akkarai to Vada Nemmeli) on both sides including service road foot path junction and toll plaza attending patch works and Vegetation removal at East Coast Road (ECR) for one year