Loading…
Loading…
19 results • Latest
Cleaning of Culverts and Storm Water Drain (SWD) by removing the manhole cover slabs and dewatering for effective disposal of rain water from Madhyakailash to Siruseri (KM 0.000 to 20.000)
External Social Monitoring Consultant for Chennai Peripheral Ring Road Project Section II and III
Consultancy services to assist in Implementation of Land Acquisition, Rehabilitation and Resettlement Plan under CPRR (Phase-II) Section-5 Project
Construction of RR Masonry Compound Wall for the connectivity of CPRR Road in Kamarajar Port Limited
Painting the existing 7 nos of Foot Over Bridges and rectification of the damaged structural Portions of the FOB at Indira Nagar, Kandanchavadi, Perungudi, Seevaram, Mettukuppam, PTC and Karapakkam Km 1.3 to 10.9 including cost of materials and labor
Road cleaning work in Rajiv Gandhi Salai OMR from km 0.000 to 3.500 ie Madhya Kailash to Kottivakkam near YMCA for a period of one year
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-04 Ch.121.200 to Ch.129.140 and Spur Road of 0.90 Km (Design Build)
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-03 Ch.113.350 to Ch.121.200 (Design Build)
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-02 Ch.107.100 to Ch.113.350 (Design Build)
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-01 Ch.101.800 to Ch.107.100 (Design Build)