Loading…
Loading…
22 results • Recent activity
Strengthening Improvement of main Carriageway and Relaying of service road including divider kerb wall and replacing the damaged manhole cover slabs with new cover slabs from Km 6.100 to 6.490, 9.380 to 9.510, 11.100 to 11.350 (LHS and RHS) of OMR
Resurfacing including milling of BT surface of selected stretches in East Coast Road from Akkarai to Uthandi LHS 2.00km Ch 22.300 to 24.300, RHS 1.00km Ch 22.300 to 23.300
Rectification of Footpath and service road paver blocks disturbed by CMWSSB for laying of 500mm dia Water main DI pipe (footpath alignment) from km 10.000 to 12.000 (RHS) ie Karapakkam to Sholinganallur of Rajiv Gandhi Salai (OMR)
Rectification of Footpath and service road paver blocks disturbed by CMWSSB for laying of 350mm dia Water main DI pipe (footpath alignment) from km 10.000 to 12.000 (LHS) ie Karapakkam to Sholinganallur of Rajiv Gandhi Salai (OMR)