Loading…
Loading…
143 results • Latest
Construction of Temporary Latrine,Temporary bath cum urinal for ladies and Supply of water for temporary Latrine, supply of water at Masir bari and Hospital area for Rath YatraFestival 2026 in Digha Jagannath Cultural Centre.
Enhance the height of Office Campus Boundary Wall at Contai Sub-Division Office under Contai Sub-Division of Tamluk Division, P.H.E.Dte.Purba Medinipur
Operation and Maintenance of distribution system including rising main, FHTC, OHR deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch ward to ensure su
Restoration of water supply pipe line under Digha Augumentation W.S.Scheme of PHED damaged due to construction of Surface drainage and laying of Sewer line at Digha under Digha Sub-Division of Tamluk Division, PHE Dte. (PART-C)
Supply of Safe Drinking Water through Trolley Mounted PVC Tank to different Villages over Non-Tube Well Area Within different Block for mitigation of drinking water crisis in the arid zone for the year 2026-2027 under Contai Sub-Division PHE Dte
Supply of Safe Drinking Water through Trolley Mounted PVC Tank to different Villages over Non-Tube Well Area Within different Block for mitigation of drinking water crisis in the arid zone for the year 2026-2027 under Contai Sub-Division PHE Dte
Supply of Safe Drinking Water through Trolley Mounted PVC Tank to different Villages over Non-Tube Well Area Within different Block for mitigation of drinking water crisis in the arid zone for the year 2026-2027 under Contai Sub-Division PHE Dte
Supply of Safe Drinking Water through Trolley Mounted PVC Tank to different Villages over Non-Tube Well Area Within different Block for mitigation of drinking water crisis in the arid zone for the year 2026-2027 under Contai Sub-Division PHE Dte
Supply of Safe Drinking Water through Trolley Mounted PVC Tank to different Villages over Non-Tube Well Area Within different Block for mitigation of drinking water crisis in the arid zone for the year 2026-2027 under Contai Sub-Division PHE Dte
Supply of Safe Drinking Water through Trolley Mounted PVC Tank to different Villages over Non-Tube Well Area Within different Block for mitigation of drinking water crisis in the arid zone for the year 2026-2027 under Contai Sub-Division PHE Dte