Loading…
Loading…
427 results • Latest
Rubber Expansion Joint for 88TK fan with Retainer Flanges for Fr6FA DLNII GT for use in VGTPS/PH-I
Gasket for Plate Heat Exchanger in Vacuum Pump No. 01 and 02
Comprehensive annual maintenance contract for 1No. Passenger lift in VGTPS / Phase-II for the period of one year from the date of commencement of work
26/26-27 DT 13.08.26 supply of 2000kgs 4 1.5/5.8 and 2000kgs of 6/5.8 MS Bold Nuts
Hiring of 01 No. Diesel Petrol driven Van Jeep under the control of Asst.Exe.Engineer OandM West vellore for the official use of Assistant Executive Engineer OandM West Vellore for a period of One Year
HT LT line erection works in Rural Palladam
Shifting of existing HT OH line convert into HT 3C X 300 Sq.mm UG Cable inside the consumers premises compound at Inland Container Depot (ICD), Opp to IOCL Terminal, L and T Bypass road, AG Pudur, Irugur, Coimbatore in respect of CEDC/Metro circle.
Engaging of 13 Nos of Outsourcing computer operator Data Entry operators for P A Circle and O o CE NCTPS to carry out the day to day data entry works for the period of one year from the date of engagement
Maintenance of Lift room, toilets, washbasins, including scavenging works in ground, first and second floor of the central office building at Tatabad, CBE for a period of 3 months from 01.09.2026 or from the date of utilization whichever is later.