Loading…
Loading…
6,109 results • Recent activity
MTPS I BM Unit III AOH 2025 26 A and B stream Boiler PA fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS-II-Mech-II -CHP-II- -FPS -Supply and Erection of gauges and transmitters in fire hydrant mains at (a) Boiler drum floor (b) Bunker Top and (c) Near Wagon Tippler area for Configuring the system pressure with DCS at UCB for monitoring fire
MTPS I BM Unit III Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides during 2025 26
MTPS I BM Unit III Rotating parts AOH 2025 26 Overhauling reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS I BM Unit III AOH 2025 26 Flue Gas duct A and B sides Patch up works and other repair works between APH out let to ESP inlet
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Maintenance of Burners and replacement of worn out fasteners at cover plates