Loading…
Loading…
6,123 results • Recent activity
MTPS-II -Mechanical-II - CHP-II - FPS - H.V.W.S of GTs - Supply and Erection of pressure switches in spray pipelines at Generator Transformers and laying of Instrument Analog Cable from the pressure switches to UCB
MTPS I BM Unit III FD Fan 3B Replacement of worn out Fan drive End bearing and Non drive end bearing and other related works
MTPS I BM Unit III AOH 2025 2026 Dismantling fabrication and erection of portion of Flue gas ducts from Economizer outlet to APH inlet of both A and B sides etc
MTPS 1 BM Unit III AOH 2025 26 ESP AB and CD Pass Hoppers strengthening of the welding joints patch welding the eroded portions and other related works etc
MTPS I BM Unit III AOH 2025 26 A and B stream Boiler PA fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS-II-Mech-II -CHP-II- -FPS -Supply and Erection of gauges and transmitters in fire hydrant mains at (a) Boiler drum floor (b) Bunker Top and (c) Near Wagon Tippler area for Configuring the system pressure with DCS at UCB for monitoring fire