Supply of Weir Type A Diaphragm Pneumatic actuator for RODM plant
MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2025 26
MTPS I Mill Plant Unit II Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 deg 11 deg 10 deg to suit dia 508 mm 12 7 mm thick coal pipe line during AOH 2025 26
MTPS I Mill Plant Unit II Dismantling the eroded 90 degree Ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during AOH 2025
MTPS I Mill Plant Unit III Dismantling of existing elliptical feeder discharge chutes mill 3A 3B reconditioning of released SS elliptical feeder discharge chutes and reassembling the same during AOH 2025 26
MTPS I Mill Plant Unit III Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom etc in any one Mill 3A 3B 3C 3F Tiltin