Loading…
Loading…
409 results • Latest
Preventive maintenance and emergency breakdown works in 346 KMs of EHT Lines under works contract in Ingur Lines section of Erode EDC for a period of 1 year
Preventive maintenance and emergency breakdown works in 333 KMs of EHT Lines under works contract in Salem Lines section for a period of 1 year
Supply and replacement of existing 1 No. 110 KV , Y phase LV OIP Condenser bushing suitable for 100 MVA BHEL Make, 230-110 kv Auto Transformer I and hot oil circulation at Unjanai 230 KV SS
Hiring of Vehicle for the official use of EE O K.R.Thoppur for a period of 1 year
Hiring Vehicle for the official use of EE O Pudhansandai for a period of 1 year
Detailed Engineering, Design, Manufacture, Supply, Erection,Testing Commissioning of 400kV DC line on MC towers with Twin HTLS conductor by converting existing 230KV SC line on SC tower with Kundha conductor on PH3-Karamadai Loc 82- 105 (Reach-III)
Detailed Engineering, Design, Manufacture, Supply, Erection, Testing and Commissioning of 400 kV DC line on MC towers with Twin HTLS conductor by converting existing 230KV SC line on SC tower with Kundha conductor on PH3-Karamadai Loc 57-82 -Reach-II
Detailed Engineering, Design, Manufacture, Supply, Erection, Testing and Commissioning of 400 kV DC line on DC towers with Twin HTLS conductor by converting existing 230 KV SC line on SC tower with Kundha conductor on PH3 - Karamadai (Reach-I)
Hiring of Petrol/Diesel driven AC Car registered with in 5 year for the official use of SE/Operation/Salem
Erection of 110 KV DC line on DC tower (1.362KM) with Panther conductor by making LILO at 110 KV Pasumalai-Anuppankulam feeder for the proposed Mykudi 110 KV SS in Madurai Reach 4