Loading…
Loading…
16 results • Latest
RAW MATERAIL
Cleaning Items
RAW
RAW MATERAIL
False Ceiling (Gypsum Board Ceiling Work), Wall Louvers, Aluminium Sliding Window Specification
LEDBULB, LED BULB, GI WIRE, SWITCH ONE WAY, 5 Pin Socket, WOODEN BOARD, MCB 16 AMP, MCB 6AMP, FUES, INDICATOR, SOLDERING WIRE, TWO WAY SWITCH, POWER CHORD 3PIN, BATTERY FOR REMOTE, BATTERY FOR LAN TESTER, RJ 45, RJ 45 COUPLER, COOLENT, Bulb HOLDER, INSULATION TAPE, Lubricant oil, POWER Three Pin TOP PLUG, GI SHEET, MS SHEET, ALUMINIUM WIRE, A4 Size Paper, CCMS FILLER ROD, Stenography notebook, Stenography apsara pencil, Stenography knife cutter, Colour chalk, Colin spray, Tissue Cloth, Rubber, Sharpner, Drawing sheet A2 Size, Crayon Pencil colour, Graph Paper, Non Dust Eraser, Surveyor Field book, Cello Tape, A4 Sheet, A3 Sheet, Pencil H, Pencil 2H, Pencil HB, Pencil B, Pencil 3B, Pencil 3H, Power Hexa Blade, HSS Tool Bit, Squre Rod, MS Round Bar, M S Flat, MS Filler Rod
Multifunction Machine MFM (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6742513 Dated : 30-09-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Enamelled Round Copper Wire as per IS 13730 (Part 0/Sec 1) (Q3), Epoxy Based Zinc Phosphate Primer (two-pack) as per IS 13238 (Q3)
Steel Flat as per IS 2062 (Q3), Welding Electrode - Covered Arc Welding Electrode - Basic Type (BEML) (Q3)
MS ERW Pipe for Bus Body Building Parts as per IS 3601 (Latest) (Q3)
High End Laptop - Notebook (Q2) (3 (3 ))
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Indoor
Hiring of Air Conditioners and Desert Coolers - Monthly Based - Desert Cooler; Steel Body Cooler
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete