Loading…
Loading…
70 results • Recent activity
M/R to damaged lining and Jungle cutting in between ch 20.00 KM. and ch. 21.80 KM. of Dy 2 of TMLC in PS. - Kotowali, Block- Jalpaiguri sadar Dist-Jalpaiguri
Repairing and maintenance of Dy-10 in between Ch. 0.00 Km and 7.325Km of TMLC for Boro Irrigation in Block and P.S.- Rajganj, Dist.- Jalpaiguri during 2025-26
Pre-Boro Maintenance and Repair works on Minor-3 of Dy-2 from Ch. 0.00 km to 13.150 km and Sub-Minor-2 of Minor-3 of Dy-2 of TMLC in Block Rajganj and Sadar, P.s-Rajganj,Dist. Jalpaiguri.
IPM to Dy no -10 of TMLC in between ch. 7.23 KM and 13.99 KM with minor -11 in P.S -Rajganj , Block -Rajganj , Dist. - Jalpaiguri
IPM to Dy no -2 of TMLC in between ch 10.00 KM. and ch. 29.28 KM. in PS. - Kotowali, Block- Jalpaiguri sadar Dist-Jalpaiguri.
Maintenance of canals including jungle cutting, repair of ghoges and damaged lining at RBMC (Ch0-305),Dy-1of RBMC (ch. 0-169),Dy-2 of RBMC (ch0-117), under KTB in PreBoro Irrigation period in P.S.-Rajganj, Dist.-Jalpaiguri during the year 2025-2026