Loading…
Loading…
1,902 results • Recent activity
IC-Divn-Repair of failed Metso ACN-CS controllers-20Nos as and when required during FY 2026 27
IC Divn-Repair of failed METSO IPSP modules 35Nosand other METSO module like APCA,DCPA module etc 15Nos. as and when required during the FY 2026 27
Annual service contract of Wagon Tippler and Side Arm Chargers - A and B sides for the year 2026-27
Estimate for Carrying out AMC works like Periodical, Preventive and breakdown Maintenance works on Eaton/Vickers make hydraulic power pack units at old Stacker/Reclaimer of MM-IV/MM /CHP/ KTPS-V and VI Stage as and when required for the year 2026-27.
Conducting Vibration analysis and condition monitoring on Crushers in MM-II SD of CHP/KTPS-V and VI Stages for the FY 2026-27
TGGENCO-YTPS (5x800MW)-Stage-1-Unit-2-TMD- Carrying out welding works of low- and high-pressure Carbon Steel, Stainless Steel, P11, P22, and P91 piping and valves in Unit-2, Turbine Maintenance Division for the year 2026-27 from the actual date of commencement of work to 31.03.2027