Loading…
Loading…
1,898 results • Recent activity
TGGENCO BTPS STAGE II CAM Division Preventive Periodical Maintenance and Regular maintenance works of Bottom Ash Hoppers and connected equipment in Unit3 and 4 Ash Handling System of Stage II BTPS during April 2026 to March 2027 during the financial year 2026-27
TGGENCO BTPS STAGE II CAM Division Preventive Periodical Maintenance works of various dome valves other valves Buffer Hoppers filter bags, Transport Air Compressor Instrument Air Compressor Dryers and Fluidizing Air Blowers in Dry fly ash system of Unit-3 and 4 in Ash Handling System of CAM Division Stage-II BTPS Manuguru for the financial year 2026-27
TGGENCO BTPS STAGE II CAM Division Emergency rectification preventive and periodical maintenance of Ash Slurry Disposal lines 1 2 and 3 from Slurry Pump House to their respective discharge points on ash pond dyke during the year 2026-27
TGGENCO BTPS STAGEII GEN Division Up Keeping Cleaning and Removal of Cotton waste iron scrap wood scrap Spider webs debris sweeping and wet cleaning of UCB Stage II in front of UCB TG Floors of Unit3 and 4 H2 Filling rooms of Unit 3 and 4 and as per the instructions of the officials on emergency requirement at times of the areas of Unit 3 and 4 of Stage II BTPS for the period from 01-04-2026 to 31-03-2027
TGGENCO BTPS STAGE II CAM Division-Preventive periodical maintenance and servicing of Precision air conditioners present in ESP Control room, Packaged air conditioners present in Administration Building and 220V DC battery chargers of stage-II and split ACs for the year 2026-27
TGGENCO BTPS STAGE II GEN Division Labour charges for attending operational issues of running equipment for round the clock for monitoring of Sump level and equipment healthiness at Ash Water Recovery Pump House for FY-2026-27 i.e. for the period 01-04-2026 to 31-03-2027