Loading…
Loading…
840 results • Latest
Idler rollers from RC 2A/B to BCN 30A/B
various Rotary Switches
Electrical Personal Protective Equipment
HAKKO Electronics Company make HMI for Stacker cum reclaimer-I machine of CHP
Thrust bearings for Stage-II VT Pumps at Kaleshwaram intake pump house
True RMS Clampmeter
KTPS-V stage -BM-Service charges forconducting Radiography ( Non- Destructive Test) on welding joints in pressure parts of Unit-X Boiler during Unit-X Annual Overhaul works for the year 2026-27-Reg
KTPS-V stage -BM-Overhauling of Louver damper Assembly ( PAD-5AB,5CD and 5EF,8A,8B,8C,8D,8E,8F) Bypass dampers, GD-5,6,7,8 and Repair/ Erection of expansion joints along with protection plates in PA and SA ducts of Unit-X in the annual overhaul of 2026-27.-Reg
KTPS-V stage -BM- Hydro jet water cleaning of Boiler water walss,platen super Heater coils, Re-heater coils, Final SH coils and Boiler II pass ( includes roof tubes, steam cooled wall tube 4 sides panels, LTHS bank and Economizer banks) during the Annual Overhaul works of Unit-10 Boiler KTPS V Stage for the FY 2026-27.-Reg
KTPS-V stage -BM-Annual Maintenance Estimate for Machining works in Boiler Maintenance Division of Unit # 9 and 10 during the year 2026-27.-Reg