Loading…
Loading…
1,902 results • Recent activity
BTPS - CHP - Overhauling and alignment of HT motors of various capacities in Operation and Electrical Division/CHP/BTPS as and when required depending upon the requirement for the period from 01.04.2026 or from actual date of commencement of work to 31.03.2027
BTPS - CHP - Removal of crusher jams, Vibrating Grizzly feeder jams and VGF screen plate cleaning at crusher house required in General division of CHP/BTPS for FY 2026-27
BTPS - CHP -Removal/lifting of spilled coal from counter weight areas of BCN- 3AB and below the conveyor galleries of BCN 3A/3B, outside areas of TP-1, TP-2, Crusher house area, TP3, TP4, TP5, conveyor BCN-4A/4B, 5A/5B, BCN 6A/6B, 7A/7B and below all the conveyor galleries and transporting to stock piles yards during the FY-2026-27
BTPS - CHP - Replacement of Landing valves/Butterfly valves, Washers for fire hydrant system, NRV/Y-Strainers/Knob valves/QBDs/Spray nozzles in the Trim kit of Spray system and Gland ropes for gate valves, preventive / Periodical maintenance works to be taken up in the firefighting hydrant and spray system and Arresting of water leaks in firefighting lines of firefighting system / CHP/BTPS for the year 2026-27 in General division of CHP/BTPS.
KTPS-V stage -I and C-Deputation of service engineer for servicing of Gland steam and Leak off steam hydraulic actuator in Unit#10 during the Annual OH 2026-27-Reg
KTPS-V stage -I and C-Deputation of service engineer for servicing of pneumatic Actuators of Unit-10 during the Annual OH 2026-27-Reg.