Loading…
Loading…
1,902 results • Recent activity
KTPS-V stage -TM-Service Supervision charges for Service Engineer for Overhauling of BFP s (Model: FK6D30), Booster Pumps (Model: FA1B56), CEP s (Model: EN8H32) in Unit-10 During Annual Overhaul 2026-27.-Reg
TGGENCO-KTPS-VII Stage-Safety Division-Refilling of DCP 9KG fire extinguishers-Quotation Called for-Regarding
KTPS-V stage -BM- Removal and Refixing of Insulation Rock wool mattresses,Aluminum GP Cladding either damaged or required at different elevations FG, PA and SA Ducts, ESP S, Mills, fans for Overhaul of Unit-X in 2026-27 and Removal and Re-fixing of insulation and metal cladding at damaged locations of Boiler in Unit-X during Overhaul period.-Reg
KTPS-V stage -BM-Overhauling of Coal and Oil firing Equipment, Dismantling, Servicing, Repairing and Re-erection of New/Re-conditioned Coal, Oil and Air Nozzles and assemble in original position of Unit-X Boiler, Transporting of Coal and oil burner assemblies, Burner Tilt Mechanism and Secondary air dampers for all 4 Corners of Unit-10 Boiler/KTPS-V Stage during the AOH Period 2026-27-Reg
KTPS-VII Stage-Civil-O and M-II -A Camps- Providing painting to the entire quarter and other miscellaneous works at Qtr.No. BDE-26 in C Colony area
KTPS-VII Stage-Civil-O and M-III-Ash Pond-Arranging water sprinkling with Water tankers on top surface of Northern Ash Pond I and II to avoid fugitive emissions of KTPS-VII Stage for the FY 2026-27 and as and when required.