Loading…
Loading…
1,919 results • Recent activity
TGGENCO-KTPS-VII Stage-Safety Division-Refilling of DCP 9KG fire extinguishers-Quotation Called for-Regarding
KTPS-V stage -BM- Removal and Refixing of Insulation Rock wool mattresses,Aluminum GP Cladding either damaged or required at different elevations FG, PA and SA Ducts, ESP S, Mills, fans for Overhaul of Unit-X in 2026-27 and Removal and Re-fixing of insulation and metal cladding at damaged locations of Boiler in Unit-X during Overhaul period.-Reg
KTPS-V stage -BM-Overhauling of Coal and Oil firing Equipment, Dismantling, Servicing, Repairing and Re-erection of New/Re-conditioned Coal, Oil and Air Nozzles and assemble in original position of Unit-X Boiler, Transporting of Coal and oil burner assemblies, Burner Tilt Mechanism and Secondary air dampers for all 4 Corners of Unit-10 Boiler/KTPS-V Stage during the AOH Period 2026-27-Reg
KTPS-VII Stage-Civil-O and M-II -A Camps- Providing painting to the entire quarter and other miscellaneous works at Qtr.No. BDE-26 in C Colony area
KTPS-VII Stage-Civil-O and M-III-Ash Pond-Arranging water sprinkling with Water tankers on top surface of Northern Ash Pond I and II to avoid fugitive emissions of KTPS-VII Stage for the FY 2026-27 and as and when required.
Singur Sweeping the Power House, Cleaning of toilets, removing of cob webs and jungle cutting around the Power House, Colony and Project Hostel at Singur HES for the year 2026 27