Loading…
Loading…
1,946 results • Recent activity
TGGENCO YTPS 5x800MW MM IICHP Removal of spilled over coal, fine dust powder , wet and Chocked Coal in TP-25, BCN-27AB,TP 10 i.e BCN 27A B HE to TE and TP-25 all floors including FG floor TP 10 27A/B HE floor in CHP YTPS and connecting conveyor of TPs 5X800MW for 51 days from 23 02 2026 or actual date of commencement of work to 31 03 2026
TGGENCO YTPS 5x800MW MM II CHP Removal of spilled over coal, fine dust powder , wet and Chocked Coal in TP 23, TP24 all floors in CHP YTPS and connecting conveyor of TPs 5X800MW from 16 02 2026 or actual date of commencement of work
TGGENCO 5X800MW YTPS Removal of spilled over coal, fine dust powder, wet and Chocked Coal in BCN 25, reclaimer 2, stacker 2 and TP 7 in CHP YTPS and connecting conveyor of TPs 5X800MW from 23 02 2026 or actual date of commencement of work to 31 03 2026
Design, Manufacture, Testing at Manufacturer works, Inspection before dispatch, packing, forwarding and transportation to site stores, Erection, testing and commissioning of 2 Nos PLANTE type 750AH Battery bank sets of 30 No cells of 2V each along with all accessories at PCHES site, Vazinepally.
KTPS VI Stage EM and MRT Complete rewinding of CGL make 90KW,415V,147A,1480rpm DBFP LOP motor with F class insulation
KTPS VI Stage EM and MRT Rewinding of 0.38 KW LT motors connected to rapping System of ESP of KTPS-VI Stage as and when required during the FY 2026 27.