Loading…
Loading…
1,950 results • Recent activity
Testing, Calibration, Servicing of Pneumatic actuators, Motor Operated Valves MOVs, Level transmitters, level switches, Pressure AND DP transmitters and temperature elements in TG AND TG Auxiliaries of Units-1AND2 as and when required during the year 2026-27
TGGENCO-Generation-Procurement of 5710MT Sulphuric Acid(Technical Grade as per IS:266-2024) for various Thermal power stations of TGGENCO
Loading and unloading and clearing of Mill rejects coal, debris and coal on feeders floor area and Transporting in KTPS-VII Stage as and when required during the FY 2026-27
Preventive AND Periodical Maintenance works on Dry fly ash lines in Units-1 AND 2 of Ash Handling System as and when required during the year 2026-27
Earmarked for "SC/ST/Waddera/Sagara Labour Cooperative societies and individual"- KTPS V VI Stage- Civil- O M- III- Engaging the tractor and Dozer (D50) along with driver for collecting and clearing of debris, garbage, vegetation and leveling of areas at TGGENCO Housing Colony, New Bombay colony, KSP Camp Colony at Paloncha for the period from April 2026 to March 2027
TGGENCO KTPP CHP MM Hiring of 1 No Coal blade dozers with 21to 24 CuM blade capacity of 325 HP to 410 HP engine on Hour basis without Fuel HSD oil including hire and crew charges round the clock as and when required for 4 months or 960 hours from the actual date of commencement OR utilization to till the completion of quantity for coal feeding to bunkers of stage-I and II at CHP and ACHP hopper area pertaining to CHP MM1 Sub Division1 KTPP