Loading…
Loading…
840 results • Latest
KTPS-V VI Stages-Civil-O M-III-Attending repairs to gates and valves at common chamber of makeup water reservoir in KTPS V VI Stages.
KTPS-V VI Stages- Civil- O M- II- Replacement of damaged FRP sheets and AC sheets on track hopper roof in Marshalling yard
KTPS V VI stages-Civil-O M-I-Removal, Segregation and Laying of pebbles of various sizes, Quartz sand and Anthracite up to floor height of 3 mts, conveyance up to Rapid Gravity Filter bed-4 of PTP area at KTPS VI Stage
TGGENCO-CETD- Supply and Installation of Acrylic Display board of size: 3 feet x 2 feet, (6SQ.FT) and size: 6 feet X 4Feet,(24 SQ.FT)for utilization at CETD/TGGENCO
Manufacture and supply of 600MT of Hi-Chrome Grinding Media Balls of sizes 50mm and 40mm for KTPS-V Stage.
TGGENCO-KTPP-Stage-II-BMD-Service charges for online testing and pressure setting of 1*600MW boiler safety valves during the year 2026-27
KTPS V VI Stages- Civil- O M-III- Providing Screed concrete for arresting leakages to roof slab of D1 Block at KSP Camp Colony, Old Paloncha
Maintenance works for TGDMCW, SGDMCW, CW and ACW in TM-4 division in FY 2026-27 or from date of commencement of work to 31.03.2027
TGGENCO-YTPS(5X800 MW)- BE-IV - Loading, transportation , unloading , cleaning of mill rejects coal, debris and coal from feeders floor area, mill pits, mill surrounding area at zero meter and dumping at the designated area earmarked in the coal plant on as and when required basis from 01.04.2026 to 31.03.2027 to be reckoned from actual date of commencement to 31.03.2027
LJHEP Removal of flood thrown muck in TRC from Ch.1090.00M to Ch.1150.00M at LJHEP, Atmakur, Wanaparthy Dist.