Loading…
Loading…
840 results • Latest
TGGENCO-KTPP-Stage-II-GENERAL-Providing 1 No.Diesel jeep along with driver for 24hrs/day on hire basis including on all holidays for conveyance of Engineers/Stage-II in case of plant emergencies for the period from 01.04.2026 or from actual date of utilization to 31.03.2027
KTPS-V stage -BM- Disposal of Accumulated Coal Powder , Debris and Scrap by engaging Tractor in Boiler Maintenance Division of KTPS-V stage for the year 2026-27-Reg
KTPS-V stage -BM- Removal and Refixing of Insulation Rock wool mattresses,Aluminum GP Cladding either damaged or required at different elevations FG, PA and SA Ducts, ESP S, Mills, fans for Overhaul of Unit-X in 2026-27 and Removal and Re-fixing of insulation and metal cladding at damaged locations of Boiler in Unit-X during Overhaul period.-Reg
KTPS VI Stage EM and MRT Complete rewinding of CGL make 90KW,415V,147A,1480rpm DBFP LOP motor with F class insulation
KTPS VI Stage EM and MRT Rewinding of 0.38 KW LT motors connected to rapping System of ESP of KTPS-VI Stage as and when required during the FY 2026 27.
TGGENCO - NSHES - Supply of Certain Pipelines, Pressure Reducing Valves, Sluice Valves, Column Pipes and Flanges at NSHES, Nagarjunasagar.
Procurement of carbon brushes for 220V DC Excitation to the Rotor through slip rings of Grade NCC 634, make Morgan, Dimensions: 60X32X25 MM at PJHES, Revulapally
Fitted Keys for HP,IP and LP turbines and sealing strips for oil guard rings
Supply of Certain Studs for HP heaters , LP heaters and BHEL make valves installed in Turbine Division
TGGENCO-BTPS-SE-STAGE-II- Providing of 1No.AC Diesel or Petrol car (YOM: Not less than 10 Years as on 31.03.2026) including driver salary, fuel charges and maintenance charges, road taxes, insurance etc., on hire basis at 12hrs per day, for official utilization of Superintending Engineer/Stage-II/BTPS for a mileage up to 3000KM per Month for the period w.e.f 01.04.2026 or from the actual date of commencement to 31.03.2027