Loading…
Loading…
30 results • Recent activity
Construction of CC Approach Road of length 200 meters from Main road to Swayambu Sri Durga Malleshwara Swamy Temple at Mustibanda and Gravel Road from Oil Palm Factory to the R and B Road at Apparaopet.(V),Dammapeta(M),Bhadradri kothagudem(D),Telangana State
Construction of CC Drain from Mutyalamma Temple to Cheruvu at Apparaopet(V), Dammapet(M),Bhadradri Kothagudem Dist.
Construction of Fresh Fruit Bunches Collection Center with Alround Fencing, CC Platform with machinery Foundations at Venkatapuram(V),Ieeja(M), Jogulamba Gadwal(D),Telangana State.
Construction of Fresh Furit Bunch Collection Center at Gopalgiri(V),Thorrur(M),Mahabubabad Dist, Telangana State
Construction of Drains, Culvert, Toilet Blocks and Workers Room at our Oil Packing Station, Shivarampally, Rangareddy Telangana state
Supply of Annual OEM Mechanical, Mechanical, Electrical and Lab Chemicals at OPP Apparaopet and Ashwaraopet, Bhadradri Kothagudem Dist, Telanagana State.