Loading…
Loading…
20 results • Latest
Electrical cable connection of 500 KVA Kirlosker make DG SET installed at District Court Lucknow (old High Court) to 04 number of electrical panel
HARDOI KE KOYALBAGH RAJKIYA COLONY ISTHIT TYPE 2 KE 48 AWASON MAI PUNAH VIDHYUTIKARAN KA KARYA
HARDOI KE KOYALBAGH RAJKIYA COLONY ISTHIT TYPE 4 KE 12 AWASON ME PUNAH VIDHYUTIKARAN KA KARYA
SITC OF FIRE HYDRANT AND FIRE FIGHTING SYSTEM AT DISTRICT AND SESSION COURT UNNAO
ELECTRIFICATION WORK RELATED TO SITC OF 2 NO LIFTS AT DOCTOR RAM MANOHAR LOHIA NATIONAL LAW UNIVERSITY
SITC OF AUTOMATIC FIRE ALARM AND DETECTION SYSTEM AT DISTRICT AND SESSION COURT UNNAO
Construction work of 40 Capacity Hostel and Barrak and 1 no. Vivechana room at Thana Madiyaon Lucknow (Electrical Work)
ELECTRIFICATION WORK OF AIR CONDITIONING SYSTEM AT ROOM AND COURT ROOMS OF HON JUDGES AT DISTRICT COURT ETAWAH
Construction work of 40 Capacity Hostel and Barrak and 1 no. Vivechana room at Thana Para Lucknow (Electrical Work)
ELECTRIFICATION WORK OF AIR CONDITIONING SYSTEM AT ROOM AND COURT ROOM OF HON JUDGES AT DISTRICT COURT AURAIYA