Loading…
Loading…
99 results • Latest
Replacement of Roof Gutters and Replacement of Existing MS Down Take Pipes with PVC Pipes at Pulbangash, Shastri Nagar and Inderlok Metro Stations.
Overhauling of EP-2002 Valves and Main Air Compressors of TK01 and TK02 Trains of RMGL Rolling Stock through the OEM, M/s Knorr-Bremse.
Repair of Viaduct Walkway and Subsequent Painting with Anti-Carbonation Paint from KNR-5/ILOK-5 to MUDK (Phase- II Viaduct), Line-5 (Green Line).
Inspection and rectification / replacement of Elastomeric and POT/PTFE bearings from Qutub Minar Ramp to Millennium City Centre at Line-2 South (For 3 Years).
Development and Maintenance of horticulture works from MVP1 to SVVR Metro Stations including Vinod Nagar Staff Quarters and Yamuna Vihar RSS at Line-7.
Secondary injection testing of numerical protection relays installed in 33KV Ring main feeders and transformer feeders of 33KV auxiliary substations of DMRC network.
Structural Repair, Retrofitting and other miscellaneous maintenance works of Piers, Viaducts, Station buildings and other associated structures from Mayur Vihar Phase-I to Shiv Vihar and Maujpur-Babarpur to Soorghat, RSS, Vinod Nagar Depot and...
Thorough Renovation of Toilet Blocks at Metro Stations BRKM, IP, YB, AKDM, NAGR, GEC, STFN, SFTN, and SSTN and Yamuna bank depot of Lines 3 and 4.
Refurbishment/ Up-gradation/ Modernization of 05 nos. lifts (04 passenger lifts and 01 freight lift) installed at Block-1 at IT Park, Shastri Park.
Upgradation and CAMC of Large Video Screen (LVS) of Line 5 and 6 installed in OCC-1 at 4th Floor Metro Bhawan.