Loading…
Loading…
1,152 results • Latest
Providing laying and jointing of UPVC Pressure (6kg/cm2 & 10kg/cm2) pipe line under shifting of existing Distribution pipe line 6200m, affected on widing of Kopra to Pokhara Road under PWD Project at villages – Koundkera, Block – Fingeshwar, District – Gariyaband.
CONSTRUCTION OF BOUNDARY WALL AT WARD NO. 10 COMPOST SHED
CONSTRUCTION OF SAMUDAYIK BHAWAN AT KOSARIYA YADAV PARA
CONSTRUCTION OF SAMUDAYIK BHAWAN
Renuation of Muktidham at Ward No 07 (1st Call)
Construction Work of Atal Smriti Talab at Ward No 13 (1st Call)
Construction Work of Dr. Bheemrao Ambedkar Smriti Talab at Ward No 06 (1st Call)
Zonal Work For 2026-27 Road SOR 15.06.2026 (Every Work upto 5.00 Lakh) 1st Call
Zonal Work For 2026-27 Building SOR 10.06.2026 (Every Work upto 5.00 Lakh) 1st Call
Construction of Toilet Block Type-1 (10 Seater) Aspirational Toilet at Thok Sabzi Mandi Subhasnagar as per enclosed specifications and drawings including Defect liability period of 36 months from the date of completion