Loading…
Loading…
20 results • Recent activity
Construction of 0.80 MLD Capacity Sewerage Treatment Plant (STP) with Moving Bed Biofilm Reactor (MBBR) Technlogy for 2BHK Housing Project at Bowrampet in Sy No.166 in Dundigal (M) of Quthbullapur Constituency including 3 months trial run and 9 months operation and maintainance Charges including Energy Consumption charges / Power Bills payable to TSSPDCL
Construction of 0.40 MLD Capacity Sewerage Treatment Plant (STP) with Moving Bed Biofilm Reactor (MBBR) Technlogy for 2BHK Housing Project at Pocharam in Sy No.62 in Patancheru (M) of Patancheru Constituency including 3 months trial run and 9 months operation and maintainance Charges including Energy Consumption charges / Power Bills payable to TSSPDCL
Construction of 0.80 MLD Capacity Sewerage Treatment Plant (STP) with Moving Bed Biofilm Reactor (MBBR) Technlogy for 2BHK Housing Project at Bandaraviral-I,II and III in Sy No.293/1/2/P and 293/1/3 in Abdullapurmet (M) of Ibrahimpatnam Constituency including 3 months trial run and 9 months operation and maintainance Charges including Energy Consumption charges / Power Bills payable to TSSPDCL
Design Upgradation and Interior Works Civil Partition Plumbing Electrical and Air Conditioning for the 2nd Floor of TGHCL Office Building at Himayatnagar Hyderabad undertaken by TGHCL on behalf of Stree Nidhi Credit Cooperative Federation Ltd
Reconditioning and replacement of damaged parts of total 44 Nos lifts of Schindler Make installed at 2BHK Housing colony at Mansanpally I and II 2412 Houses Maheshwaram Constituency
supply, laying, erecting, testing and commissioning of 450mm dia NP3 class RCC Pipe, construction of RCC chambers for disposal of STP treated water for a distance of 600mts to RCC culvert for discharge into nearby water body(pond) at 2 BHK Kollur-II housing project in GHMC area