Loading…
Loading…
233 results • Latest
SHIFTING , RELOCATE AND LAYING OF 250 MM DIA DI PIPE FOR 530 M LENGTH- SUTHAMALI JUNCTION CH-21000 TO CH-21300 AND TIRUNELVELI ROAD FROM 000 M TO 160 M AT KONDANAGARAM HEAD WORK- SIRIVASA NAGAR PUMPING MAIN.(WESTERN BY PASS SUTHAMALLI JUNCTION)
SHIFTING , RELOCATE AND LAYING OF 600 MM DIA DI PIPE FOR 530 M LENGTH- SUTHAMALI JUNCTION CH-21000 TO CH-21300 AND TIRUNELVELI ROAD FROM 000 M TO 160 M AT KONDANAGARAM HEAD WORK-TIRUNELVELI TOWN PUMPING MAIN.(WESTERN BY PASS SUTHAMALLI JUNCTION)
Construction of drain and culvert at Sankarankoil road near Santhimarithamman koil in ward no.14
Leak arresting work for distribution Main various location at ward no.1,2,3,4 13 in Thachanallur ward
Leak arresting work for distribution Main various location at ward no.10,11,12,14,28,29 30 in Thachanallur ward
Leak arresting work for distribution Main various location at New ward no.20,21,22,23,24,25 26 in Tirunelveli ward
Leak arresting work for distribution Main various location at New ward no.20,21,22,23,24,25 26 in Tirunelveli ward
Renewal of BT Surface at 1.Mahizhchi Nagar 2nd Street, 2.Mahizhchi Nagar 9th Street, 3.Mahizhchi Nagar Kalaignar Road, 4.Mahizhchi Nagar 3rd Street, 5.Mahizhchi Nagar 4th Street, 6.Mahizhchi Nagar 5th Street, 7.Mahizhchi Nagar 6th Street, 8.Mahizhchi
Renewal of BT Surface at 1.ANBU NAGAR (146040R2986), 2.Anbu Nagar 1st Street (146040R2987), 3.Anbu Nagar 2d Street (146040R2988), 4.Anbu Nagar 3rd Street (146040R2989), 5.Anbu Nagar 4th Street (146040R2990), 6.Anbu Nagar 5th Street (1460
Reconstruction of Drain with Cover Slab at Seikul Akbar Street Back Side in ward No. 44