Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
566 live285 closing this weekmost from TNEB Limited
566 results • Latest
Procurement of Various sizes of High Strength Friction Grip Bolts Nuts Studs 04 Items
Linework for LILO of the 400 kV Koodankulam PGCIL with the proposed 400 kV Udangudi Samurengapuram
Supply and erection of 110kv Capacitor Banks totaling 336 MVAR at various SS
MTPS II Mill Plant Division Applying of two layers of ceramic wear coat Eromat at inner surface of released coal mill outlet bends after cutting removing damaged wornout portions and welding with new patch plate during COH 26
Supply of SE Copper Winding Wire of various sizes for DT repairing works in Special maintenance Cuddalore
MTPS I MP Providing of 1No Diesel driven Tata Sumo Chevrolet Tavera of 9 1 seating capacity or an equivalent Vehicle on hire basis including driver for the official use of EE MP for the period of one year from 13 01 2027 to 12 01 2028
Supply Cork Gasket of various sizes for DT repairing works in Special maintenance Cuddalore
MANUFACTURE AND SUPPLY OF 22KV AB Switch with PT Insulators
Execution of Execution of 3Nos of Capital works and 1no IMP at Venketeswarapuram Section in Alangulam Sub Division in Rural Division in respect of Tirunelveli EDC.
Supply and erection of 11kv, 22kv and 33kv Capacitor Banks totalling 192 MVAR at various SS
the Rebabbitting of one set of 7 nos of Generator top guide bearing pads for 8MW machine at Papanasam Power house
Providing of One Number Diesel Driven Car/Van/Jeep on hire basis for the daily official use of Executive Engineer/Operation/ Anikadavu for a period of 1 year from the date of utilization
Hiring Vehicle for Diesel Petrol Driven VAN JEEP for the use AEE O and M Town Attur
Procurement of Three Phase Numerical relay Test Kit SVERKER 900
Providing One Number Diesel driven Van/Jeep or equivalent for the use of Executive Engineer/Electl/Din - XV/Ennore SEZ STPP
Procurement of HS Straight Joint Kit , HS Outdoor Termination kit and HS Indoor Termination kit for 33 KV 1 X 630 sqmm XLPE cable
Supply of Three Phase Electronic Reference Standard Meter
Supply of Time Interval Meter for measuring circuit breaker close/trip operation time
Providing chain link fencing around the PSC pole casting yard at MG Pudur in MG Pudur 110 11 KV Sub Station premises
Supply of Guarding X Arm
Improvement Works to the replace damaged cover slab at Andimadam 110 KV SS in Perambalur EDC
Improvement Works to the replace damaged cover slab at Eachangadu 110 KV SS in Perambalur EDC
Providing a new protection wall to the unprotected Road facing of south boundary at Samayapuram PSC Yard (from chainage 0m to 68m) Samayapuram
Supply of Journal Spring Assembly for HP 803 Bowl mills.
Procurement of Electro Pneumatic Positioners to be used at UF Blocks in RODM Plant
Procurement of Soft Seal for Rotex make Secondary Air Damper Control (SADC) Pneumatic Power Cylinders
Execution of works along with supply of materials for provision of 33 KV feeder for Serakulam SS
BM Division Unit-I -600MW Replacement of 550 NB internally damaged/Valve Passing MSSV-02 Valve (RHS) with new one by Cutting the existing MS line, Remove the damaged valve, Edge preparation, Fit-up the new valve
Supply of Stay Clamp 9.0 Mtr and Back Clamp 8.0Mtr for PSC Pole
BM Division Unit-I Boiler 600 MW Annual Overhaul Works for Reconditioning of coal nozzle tip (released from Unit II Boiler) during the year 2026-27
MTPS-I ES Circle EMI Rewinding , Bearing replacement Rotor Refurbishment of 30 KW AWCWP-1C motor Sl.No. 2860879 6 released from AWCWP 1C bed at Unit-I MTPS I
MTPS I Mill Plant Centralized A C Plant Attending Breakdown works in AC Cooling tower fans Air handling units Air washer system Circulating water pumps pipe lines and valves etc for a period of 365 days from the date of commencement of works
Service Building _ Sweeping, cleaning and mopping floors, removing the Garbages from each floor and dumping into 0 m dust bins for a period of one year from the date of commencement of work.
Work contract for Erection and dismantling of DT, Structure, Pillar, Laying of HT and LT cable towards extension, DCW works and LT Network improvement works in respect of Mylapore Division of CEDC Central for a period of One year
MTPSI ES Circle EMI Maintenance of various capacity of Unit battery sets, station battery sets RWPH battery sets by transporting DM water from DM plant to each Unit battery room station battery room and RWPH battery room, cleaning applying petroleu
MTPS II- M - II circle - CHP - II Division - EMC -Attending daily and Routine maintenance works of Environment monitoring cell, up keeping of CEMS Room and CAAQMS Room Environment related equipments and assisting other environmen
MTPS I MP AC Plant Preventive Breakdown maintenance of Voltas make water cooled screw chiller No 1 and 4 Model No EGWFXR3002ML at MTPS I For a period of one year from the date of commencement of work
Periodical cleaning of all drains in bottom ash hopper plant area, boiler area and mill area in Unit_I, II and III and C row drain at Power House for a period of one year from the date of commencement of work.
Outsourcing of 5 nos. of computer operator data entry operator for a period of one year in respect of CEDC Central from date of awarding the contract.
Work contract for Erection and dismantling of DT, Structure, Pillar, Laying of HT and LT cable towards extension, DCW works and LT Network improvement works in respect of T.Nagar Division of CEDC Central for a period of One year
Maintenance of the plants on centre median in the reach from Union office to ware house for the period of one year from the date of commencement of work.
TTPS Operation Circle MPM II Unit IV and V Reconditioning of the worn out journal head assembly released from Unit IV and V HP 803 Mills and assembling with pillow blocks
TTPS Operation Circle MPM II Unit IV and V Replacing the worn out journal head assembly by reconditioned sets in HP 803 Mills
Power House building _ Cleaning of toilets in the Power House and switch yard building for the of one year from the date of commencement of work.