Loading…
Loading…
6,057 results • Latest
TTPS Operation Circle CAD Dismantling the second hand healthy 200NB GLR IV service water pumping line, re erection and Commissioning of 200NB M.S pipes for a length of 360Mtrs from Switch Yard-II to EE CMD I Ofiice. OHT II to GLR I service water
Enq.No.32-I 25-26 Supply of 11 KV Transformer Structure Materials (Double Pole)Complete set
Supply of 1400mm Belt Width 5 Ply 5/3 800KN per M Nylon bye Nylon Conveyor Belt for Conveyor 27B
TTPS Operation Circle CAD Dismantling the badly worn out structure and fabrication and erection of new M.S Structural supports with platform for Heat Exchanger of ACW system of Unit IV V
Supply and Erection of seal plates SS 304 gr 3 mm thick for conveyor 48 A1 return belt side at SCH II
Fabrication and Supply and Erection of RBFD 21 reverse chutes Top and Middle and Bottom at Secondary Crusher House I