Loading…
Loading…
4,520 results • Latest
Electrical works for Kadaladi 110 KV SS
Procurement of SF6 Gas
Procurement of 200 NB MS ERW Pipe, 200 NB MS ERW Flange and 150 NB MS Flange for fire protection system of all over plant
Please refer Tender Documents
MTPS I Mill Plant Unit III Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies hard facing of clamping ring bowl hub cover strengthening welding of journal header guard
MTPS 1 Mill Plant Unit III Attending the Break down Preventive maintenance works such as overhauling of Gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing worm shaft thrust and radial bearing
TTPS Mech II BM Unit II Erection of Cold Intermediate heating elements of Type E27 for Unit II Airpreheater Model 27 VIT M 2000
TTPS Mech II TM I Unit I 210 MW LMW Turbine Supply of second hand HP LP by pass system complete assembly of 210MW LMW design Turbine of Satpura thermal power plant Sarni Madhya Pradesh which was auctioned for decommissioning including Transport
TTPS Mech II BM Unit II Erection of Cold End heating elements of Type DC E27 for Unit II Airpreheater Model 27 VIT M 2000
TTPS Mech II BM Unit II Replacement of eroded pressure parts tubes in water wall screen tubes super heater screen tubes rear water wall tubes left water wall tubes and Hot reheater of Unit II Boiler during overhaul 2025 2026
Eerection of 110 KV DC MC line on DC MC towers for conversion of existing T-Off arrangement in to LILO arrangement of 110KV Theni-Sempatty Feeder II at Periyakulam 110 KV SS in Madurai OPeration Circle.
Cleaning of equipments of Power House andWinch House and Switchyard and providing assistance to trolley guard duty and carrying out all other works as per the instruction of Engineer in charge under works contact for a period of 1 year from the date
supply of Stainless steel plate 10 mm thick
NCTPS I SE MI circle AMC 26 27 MPM Dn Unit III Collection of Coal Mill rejects Coal from unit III mill chute Quenching removing stacking near mills loading and unloading conveying by using tractor tipper lorry weighing in department weighing
NCTPS I SE MI circle AMC 26 27 MPM Dn Unit II Collection of Coal Mill rejects Coal from unit II mill chute Quenching removing stacking near mills loading and unloading conveying by using tractor tipper lorry weighing in department weighing mac
NCTPS I SE MI circle AMC 26 27 MPM Dn Unit I Collection of Coal Mill rejects Coal from unit I mill chute Quenching removing stacking near mills loading and unloading conveying by using tractor tipper lorry weighing in department weighing mac
Works Contract for Dharapadavedu Section
Works Contract for Latheri section
Works Contract for Latheri section
Works Contract for Latheri section
Works Contract for Latheri section
As per NIT
Works Contract for Dharapadavedu Section
Works Contract at Sholinghur SS
Works Contract for Mittoor Section.
Works Contract for Mittoor Section.
Works Contract for Mittoor Section.
Procurement of Square type Coal Compartment Assembly
Works Contract for Urban Katpadi Section
Works Contract for Urban Katpadi Section
Works Contract for Mittoor Section.
Works Contract for East Gandhi Nagar Section
Works Contract for P.K.Puram Section.
Works Contract for K.V.Kuppam Section.
Works Contract for Vaduganthangal Section
Works Contract for K.V.Kuppam Section.
Works Contract for K.V.Kuppam Section.
Works Contractor for KV Kuppam
Works Contract for Urban/West/Gandhi Nagar Section
Works Contract for P.K.Puram Section.
Works Contract for Urban/West/Gandhi Nagar Section
improvement works by providing Chemical treatment for old AC roofing sheet supplying and fixing of BLDC wall mounted fan Colour Washing Electrification works at Project Best section AEE Town Erode Sub division in EEDC Erode
TTPS Mech II TM I Dismantling Inspection and overhauling of Alfa Laval make unit oil Centrifuge in Unit III during forthcoming overhaul
Engaging of Additional manpower of 6 persons per day per each sections of Walaja Sub division
Engaging of additional Manpower of 6 Persons per day per each sections of Urban Ranipet sub division
Engaging of additional Manpower of 6 Persons per day per each sections of Sipcot sub division.
Works contract for Day to day Preventive and Breakdown Maintenance including Emergency breakdowns at night in 400KV, 230KV and 110KV lines for Two Years in respect of Hosur lines section under the control of EE/Operation/Hosur Operation Division
Construction of brick wall
Supply of HS O/D Type Straight joint kits for 33 KV, 3X400 Sq.mm XLPE Cable and 11 KV 3X300 Sq.mm XLPE Cable.
Supply of 22KV Composite Polymer Pin insulator