Loading…
Loading…
6,144 results • Latest
Engaging of additional Manpower as per the Instructions of DD vide letter No CE PLG RC EA F Man power 2025 Dated 17.11.2025 Memo. No. DD EA F.Man power Summer 2026,DT.28.01.2026 for quick restoration of power supply during Summer 2026
Bearings for Ash Handling Pump House
Engaging of additional Manpower as per the Instructions of DD vide letter No CE PLG RC EA F Man power 2025 Dated 17.11.2025 Memo. No. DD EA F.Man power Summer 2026,DT.28.01.2026 for quick restoration of power supply during Summer 2026
Rectification Works to the Damaged Ash Slurry Trench Inner Walls below GL leading from ESP 5 Control Room to Ash Water Tank CH 120m to CH 160m in Unit 5
MTPS-I ES Circle EM-I Breakdown maintenance of LT critical motors in Unit 1 to IV during emergencies for a period of 6 months from the date of commencement of work
Rectification Works to the Damaged Ash Slurry Trench Inner Walls below GL leading Bottom Ash to ESP 5 North side from CH 0m to CH 80m in Unit 5