Loading
Loading…
Loading…
6,119 results • Latest
Supply of Bucket Wheel Chute with Skirt Board Assembly for Reclaimer 2 Machine
Estimate for 1 no. of Proposed 1 x 100 KVA DT TF II A service Connection To The Executive Engineer, Kadukkarai SS I 100 KVA undert Azhagiapandipuram Section
TTPS Operation Circle MPM I Unit I Overhauling of hand operated overhead chain block trolleys 8 Nos of 7.5 Tons capacity each
MTPS OAHS FAM PDFACS Operation and Maintenance of pressurized dense fly ash collection system PDFACS for disposal of dry fly ash on tonnage basis Unit I
Supply of 150 sets of 22KV Standalone structure material complete set
Supply of 11KV Single Pole Standalone Complete Set