Loading…
Loading…
6,049 results • Latest
Supply of ECO Hopper Spill over Ash disposal tray for A path of Unit III ECO hoppers
Rectification and Repair Works to the Drain to the East of FOPH 2 Building in Unit 4 and 5 area at TTPS
providing 1No. (5 PLUS 1 seat capacity) diesel driven jeep/van on hire basis for the daily official use ASSISTANT EXECUTIVE ENGINEER / PYKARA DAM for the period of one year from the date of utilization
Supply of Spares for Stage I and II Bottom Ash Hopper Ash disposal system
Rectification Works to the Damaged Pedestals and Providing Encasing Concrete to the Structural Steel Columns in Bottom Ash Hopper area in Unit 4
Rectification Work to the Damaged Pedestals and Providing Encasing Concrete to the Structural Steel Columns in ID Fan 4 A and 4 B area