Loading…
Loading…
6,046 results • Latest
Improvement Works to North side Drain in 263 S Road from JT 4 to Coal Yard Culvert
NCTPS I SEMII Circle ICHS Dn FOPH Cleaning of HFOLDO Filters at fuel oil pump house lorry unloading pump house and platform, Overhauling and re-fixing of flame arrestor on the top of the LDO HFO Tank II attending oil leak alignment in HFO pump at FO
Formation of Road along the West side Store Compound Wall from Token Gate Peripheral Compound Wall to Watch Tower 3 in the Mill Reject Yard at TTPS
Resurfacing the existing black topping road outside Main Gate NTPL Compound Wall West side Reach 4 at TTPS
NCTPS I SE M II Circle ECHS Dn Erection and commissioning along with material of Railway track points and crossing 1 No Point No 122 at NCTPS I siding
Running Work Contract for AEE / O and M / Vallakottai Sub Division inrespect of Sriperumbudur Division