Loading…
Loading…
6,057 results • Latest
Improvement works by providing the chain link fencing with M.S.Angle fence post in front South side South Eastern side and Eastern side of the Substation premises at Sathankulam Substation
Carrying out cleaning transporting loading unloading of equipments tools and materials and carrying out all other works as per the instruction of Engineer incharge at Sholayar PH I under work contract through outside agency period of one year
Provision of 11 Nos 5MP IP Colour Camera 4Nos each to Rural and Urban Substores
Improvement works for the Construction of compound wall to replace the damaged fencing at Northern side for about 30m from East end compound wall at Central Store premises, Tuticorin
Repair and maintenance works to the Control room and pump room buildings at 110/33-11 KV M.Duraisamypuram SS Premises.
TTPS Mech II AHP Unit 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 56 500 MT fly ash in Unit III to V from the date of handing over of site