Loading…
Loading…
162 results • Latest
Providing and laying of Vinyl flooring for Boiler No.6 and 7 control room during shutdown at TNPL Unit I
Construction of toilet blocks for TM#5 Plant at TNPL Unit II
Supply of SS Pipes for TM#5 project Lot VI
Supply of SS Pipes for TM#5 project Lot V
Replacement of damaged steel ventilator with RCC Jalli at Paper Machine No.1 and 2 (Phase I) at TNPL Unit I
Supply and fixing of roof and cladding sheets in loading Bay area in TM#5 at TNPL Unit II
Providing RCC road in North, South and East Sides of Boiler #8 (Phase 1) for RSPS#2 Project at TNPL Unit I
Laying of acid proof tiles in Storage Chests area during Annual Shutdown in Paper Machine No.1 and 2 at TNPL Unit I
Supply and application of protective epoxy screed (2mm thick) in tender side floor area at TM#5 plant at TNPL Unit II
Repairing and renovation of RCC Paltech Cooling Tower at TNPL Unit I