Loading…
Loading…
47 results • Latest
Design, Manufacturing, Testing and Supply of 95 Nos. 50 MVA 132/33kV PTRs in 2 LoTs. (Lot-1-: 50 Nos. , & Lot-2-45 Nos.)
Stabilization of vertical cut soil by installation of Geosynthetic cementitious composite mat GCCM - nkrete 9 9mm thick with HDPE back fleece with proper anchorage on the North side boundary at Kapuluppada 132KV GIS SS, Visakhapatnam District
Replacement of aged 220kV LAs, PTDB & LTAC panel at 220kV VSS under RMI 2023-24 scheme
Painting of 132kV Eluru Kanumole and 132kV Pedavegi Kanumole Line from Loc.No. 83 to 135 with one coat of Red oxide primer and one coat of Aluminium Paint.
(i)Replacement of existing 7.2 MVAR Capacitor bank in 33KV Bus section-I with new 14.4MVAR Cpaciotr bank (ii) Erection of 1No.33KV 14.4MVAR Capacitor bank bay in 33KV Bus section -II along with associated equipment at 220KV SSNuzvid under RMI scheme 2024-25.
Rising of Chimneys for various Tower Locations of 400KV DC Lines in the Limits of the Lines Sub Division Vemagiri, East Godavari District.
Providing of Migration of existing SAP Cloud environment to a new Service Provider Cloud, Hosting and Providing Managed Services for the migrated Cloud environment for a period of 2 Years
Rectification of damaged 220kV XLPE, UG Cable of 220kV Bommuru to Vepakayaladibba feeder near 220/33kV SS, Vepakayalkadibba caused due to unauthorized excavation works for erection of 33KV Spun pole by APEPDCL 33kV line contractor M/s. Vijaya Krishna, Power Technologies, Visakhapatnam on 19.06.2026
Replacement of existing too old 220KV Twin Zebra Bus with ACSR Twin Moose conductor at 220KV Gunadala Sub-Station in NTR District
Supply of certain Hotlines T&P for Hotlines Sub division, Vijayawada