Loading…
Loading…
504 results • Latest
APSPCL - LAD - AUMSP (1000 MW) - Laying of CC Platform for prayer area and internal CC roads in Muslim burial ground (Khabarsthan) at Ward no 32, near Government general hospital, Kadiri Town of Sri Satya Sai District, A.P.
Supply, Erection, Testing and Commissioning of 220 by 33kV Features at 220 by 132kV SS Pampanuruthanda for Integration of 225MW BESS in Sri Sathya Sai District on turnkey basis.
Supply of 1 ACSS RW Panther Equivalent Conductor 100KM 2 ACSS RW Zebra Equivalent Conductor 100 KM 3 ACSS RW Moose Equivalent Conductor 100KM
Hiring charges of 1No. utility Vehicle of model up to 7years old for the official utilization of the Deputy Executive Engineer/Hot lines/Vizianagaram for a period of 12 months i.e. from 01.04.2026 to 31.03.2027 and renewable every year upto 31-03-2029 on mutually agreed condition
Erection of 2 nos 33 KV feeder bays at 220 KVSS Palamaneru in O and M Circle Tirupati to avoid over loading of existing 33 KV Industrial feeder on Semi-turn key basis
erection and commissioning of 1No. 11KV outdoor feeder bay in place of existing 11KV LV Kiosk-I at 220/11KV SS Muchumarri LIS in O&M circle, Kurnool
Providing and Fixing of Step bolts and phase plates at various locations in between 226 to 282 in 220KV Piduguralla- Inaparajupalli Circuit 1 & 2 DC Line under the jurisdiction of EHT Lines Piduguralla in Palnadu Dt.
Hiring of 1 No. utility vehicle or bolero camper or equivalent model upto 7 years or later model for the utilization of Deputy Executive Engineer/Maintenance/Gajuwaka for a period of 11 months from 01.05.2026 to 31.03.2027 and renewable every year upto 31.03.2029 on mutually agreed condition
Hiring of 1 NO. 3 Ton van upto 7 years or later model for the utilization of deputy executive engineer/Maintenance/Parawada for a period of 11 months from 01.05.2026 to 31.03.2027 and renewable every year upto 31.03.2029 on mutually agreed condition
Hiring charges of 1No. Utility Vehicle of model up to 7years old for the official utilization of the Deputy Executive Engineer /Construction /Vizianagaram for a period of 11 months i.e. from 01.05.2026 to 31.03.2027 and renewable every year upto 31-03-2029 on mutually agreed condition.