Loading…
Loading…
438 results • Latest
Replacement of badly rusted 02No. MS towers with GI towers on same stubs in 132KV Nidadavole-Tie-I line from 132KV Nidadavole SS to 220KV Nidadavole SS in O&M Circle, Eluru under RMI Scheme
Construction of compound wall in place of chain link mesh fencing along main road and other miscellaneous works at 220KVSS, Nandyal .
Hiring 1 No Utility vehicle for official utilization of Deputy Executive Engineer/ EHT Lines sub division/Simhachalam /Visakhapatnam for attending regular and emergency O&M operations from 01.05.2026 to 31.03.2027 and renewable every year upto 31.03.2029
Hiring 1 No Utility vehicle for official utilization of Deputy Executive Engineer/ Maintenance sub division/Pendurthi/ Visakhapatnam for attending regular and emergency O&M operations from 01.05.2026 to 31.03.2027 and renewable every year upto 31.03.2029
Supply Installation testing and commissioning of 25 Nos MPLS TP type FOTE equipment for 25 Nos substations along with NMS under RMI 2023 24 for replacement of existing SDH based FOTE equipment
Improvements by Widening and strengthening to Bheemunipatnam- Narsipatnam road from Km 2/100 to 8/400 (2 Lane to 4 Lane) in Visakhapatnam District.
Reconductoring of existing ACSR zebra conductor with ACSS RW zebra equivalent conductor in 220KV Gajuwaka Gangavaram 8KM line on turnkey basis in OnM Circle Visakhapatnam
Painting of badly rusted MS towers with one coat of red oxide and one coat of aluminium paint in 132KV Narayanapuram PT Palli line on OnM Circle Eluru
Painting of badly rusted MS towers with one coat of red oxide and one coat of aluminium paint for towers in 132KV K Kota T Narsapuram and 132KV T Narsapuram Aswaraopeta DC feeder in OnM Circle Eluru
Painting of badly rusted MS towers with one coat of red oxide and one coat of aluminium paint in 132KV Bhimadolu Pedavegi line in OnM Circle Eluru
Hiring of 1No Diesel driven Bolero or Utility Vehicle model up to 7years old for the utilization of the Deputy Executive Engineer, Construction, Sub Division II, Kadapa for a period of 11 months from 01.05.2026 to 31.03.2027 and renewable every year up to 31.03.2029 on mutually agreed condition in YSR Kadapa District.
Hiring of 1No. Petrol/Diesel driven Non A/C car model up to 7years old for the utilization of the Executive Engineer/ Construction/Kadapa for a period of 11 months from 01.05.2026 to 31.03.2027 and renewable every year up to 31.03.2029 on mutually agreed condition in YSR Kadapa District.
Providing of Non-A/c Diesel utility vehicle on HIRE basis for official utilization of the Dy. Executive Engineer/Maintenance/220KV SS/Yerraguntla for the period from 01-05-2026 to 31-03-2027.
Major & Minor repairs existing Drinking water & Toilets to facilities to DR. Ambedkar residential school for Boys at Arikera (V) of Alur (M)
Replacement of badly damaged rusted tower at Loc No.10 in 400kV Kalapaka -STPP-3&4 TMDC Line
Conducting Detailed Survey for the proposed 400kV DC Line with ACSS Moose Conductor by making LILO of 400kV Krishnapatnam-Sembcorp Plant 2 (SEIL P2) line to the proposed new 400kV Sub-Station at Sanampudi(V), Singarayakonda(M), Prakasam district.
Providing of 1No. hired utility vehicle (Bolero Camper) on all days including holidays for the official conveyance of Deputy Executive Engineer/ EHT Lines/Gunadala with head quarters at Gunadala for the period from 01/05/2026 or from the date of actual utilization to 31/03/2027 and renewable every year upto 2029
Supply and laying of additional OPGW cable of 96Fiber capacity on exhausted OPGW line sections and in-demand routes along with strengthening of 9676 Nos of Towers of APTRANSCO
Hiring of 1No. sedan A/C car model upto 7years old for the utilization of the Chief Engineer/Zone/Visakhapatnam for a period of 11months 01.05.2026 to 31.03.2027 and renewable every year upto 31.3.2029
Proposed extension of HDPE pipe lines 200mm dia at Sai Ram layout in ward no.96 of Zone-VIII, GVMC
Repairs to public toilets at Durga Ghat and Punnami ghat toilets in view of Swachh survekshan-25-26- in 38th division in circle-I area.
Carrying out O and M works of 220 KV and 132 KV transmission towers and lines of 511 ckm under EHT lines subdivision Rajampeta in O and M Kadapa Circle on works contract basis.
Painting of MS tower parts with one coat of Alluminium paint over primary coat of Red oxide paint for 132KV Chillakallu Peddagopathy Pammy DC line from Loc Nos 105 to 138
Hiring of utility vehicle for DEE/Lines 1/CONST/VSP
Hiring of utility vehicle for DEE/SS/CONST/VSP
APSPCL - LAD - AUMSP (1000 MW) - Laying of CC Platform for prayer area and internal CC roads in Muslim burial ground (Khabarsthan) at Ward no 32, near Government general hospital, Kadiri Town of Sri Satya Sai District, A.P.
Supply, Erection, Testing and Commissioning of 220 by 33kV Features at 220 by 132kV SS Pampanuruthanda for Integration of 225MW BESS in Sri Sathya Sai District on turnkey basis.
Supply of 1 ACSS RW Panther Equivalent Conductor 100KM 2 ACSS RW Zebra Equivalent Conductor 100 KM 3 ACSS RW Moose Equivalent Conductor 100KM
Hiring charges of 1No. utility Vehicle of model up to 7years old for the official utilization of the Deputy Executive Engineer/Hot lines/Vizianagaram for a period of 12 months i.e. from 01.04.2026 to 31.03.2027 and renewable every year upto 31-03-2029 on mutually agreed condition
Erection of 2 nos 33 KV feeder bays at 220 KVSS Palamaneru in O and M Circle Tirupati to avoid over loading of existing 33 KV Industrial feeder on Semi-turn key basis
erection and commissioning of 1No. 11KV outdoor feeder bay in place of existing 11KV LV Kiosk-I at 220/11KV SS Muchumarri LIS in O&M circle, Kurnool
Providing and Fixing of Step bolts and phase plates at various locations in between 226 to 282 in 220KV Piduguralla- Inaparajupalli Circuit 1 & 2 DC Line under the jurisdiction of EHT Lines Piduguralla in Palnadu Dt.
Hiring of 1 No. utility vehicle or bolero camper or equivalent model upto 7 years or later model for the utilization of Deputy Executive Engineer/Maintenance/Gajuwaka for a period of 11 months from 01.05.2026 to 31.03.2027 and renewable every year upto 31.03.2029 on mutually agreed condition
Hiring of 1 NO. 3 Ton van upto 7 years or later model for the utilization of deputy executive engineer/Maintenance/Parawada for a period of 11 months from 01.05.2026 to 31.03.2027 and renewable every year upto 31.03.2029 on mutually agreed condition
Hiring charges of 1No. Utility Vehicle of model up to 7years old for the official utilization of the Deputy Executive Engineer /Construction /Vizianagaram for a period of 11 months i.e. from 01.05.2026 to 31.03.2027 and renewable every year upto 31-03-2029 on mutually agreed condition.
Construction of Anganwadi building at Iskapalli Harijanawada in Iskapalli GP, Allur Mandal
Temporary Restoration of Damaged Bridge in kalumudi kaluva near Pallapalli, Iskapalem Village in Buchireddypalem (M) of SPSR Nellore District.
Arrangement of Chalivendram points at Various locations (Arasavaali temple Arch, PSNM mill, Opposite Zilla parisath office, Ponnada Bridge, Thrish Honda ,Municipal office, Seven roads, Collector office road, Suryamahal Jn and Polytechnic college) junctions as a part of Summer action plan-2026 in Srikakulam Municipal Corporation
Improvements to the road Ibrahimpatnam to Damulru road from Km 0 000 to 12 800 in NTR District 2nd call
Modification of the existing 11KV Kiosk-I of LV side of Power Transformer at 220/11KV SS, LIS, Nansuralla with outdoor CTs, Breakers & Isolators under RMI 2023-24
Modification of the existing 11KV Kiosk-I of LV side of Power Transformer at 220/11KV SS, LIS, Lakkasagaram with outdoor CTs, Breakers & Isolators under RMI 2023-24
Painting of MS towers with one coat of red oxide paint & one-coat of aluminium paint in 132KV MAcherla-KCP-Veldurthy DC line from loc.no.01 to 09 under the jurisdiction of EHT Lines Tallapalli
Providing of an intermediate tower for improving vertical clearance for 132KV C.K.Palli-Moolavanka line.
Supply, erection stringing and commissioning of OPGW cable and hardware accessories including spares for intra state and inter state lines under RMI 2023 24.
Procurement of 740 Nos. 33kV Polymer LAs (31mm/kV Creepage distance) and 68 Nos. 220kV Polymer LAs (31mm/kV Creepage distance)
Improvements to the road Chamdramoulinagar Mollagunta from km 0/0 o 1/120 in Bapatla District
Modification of the existing 11KV Kiosk-I of LV side of Power transformers at 220/11KV SS, LIS, Settypalli with outdoor CTs, Breakers & Isolators under RMI 2023-24
Supply, Erection, Testing and Commissioning of 1. 220by33KV Sub Station at Talaricheruvu for Integration of 275MW BESS and 2. Erection of 220 KV Double Ckt LILO lines from 220KV Talaricheruvu to PSS.2 DC line to Proposed 220by33KV BESS Sub Station at Talaricheruvu duly replacing the existing ACSR Moose Conductor with ACSS Moose Conductor in Ananthapuramu District on turnkey basis.
Modification of Kiosk II and III at 220KVSS BRAHMANAKOTKUR