Loading…
Loading…
104 results • Recent activity
Construction of VRCC storm water drains to all roads of Special Food Processing Park - Wargal Phase - II at Wargal (V and M) Siddipet District.
BT Renewal with DBM and BC to existing internal roads at Genome valley Phase II, Kolthur(V), Shameerpet(M), Medchal-Malkajgiri Dist.(Under IALA Funds).
Repairs and Maintenance of the existing street lights at Kakatiya Mega Textile Park, Shyampet(V), Geesugonda(M), Warangal Dist. for the financial year 2026-27 under IALA Works.
Strengthening of existing damaged Gravel Road in Front of Plot Nos. 196 to 200 with CC Pavement with VDF Flooring at Industrial Park Madikonda, Hanamkonda Dist. (With IALA funds)
Strengthening of existing damaged Gravel Road in Front of Plot Nos. 116 to 127 and 134 to 138 with CC Pavement with VDF Flooring at Industrial Park Rampur, Hanamkonda Dist. (With IALA funds)
Drain Raising and removal of silt to existing Storm water drains in all Phases at IDA Jeedimetla, Medchal Dist(Under IALA Funds).