Loading…
Loading…
526 results • Recent activity
Construction of interlocking road 235 mtr at second stage compound of ram janki pump canal block badhokhar khurd distt banda
Construction of CC road 86 mtr. and interlocking road 95 mtr. at first stage compound new ramjanki Pump canal block badhokharkhurd Distt Banda
PROVIDING LAYING AND JOINTING OF AC PRESSURE PIPE BY MAZZA PROCESS OF 900 MM DIA 1.88 KM FOR MAIN CANAL EXTENDING FROM THE SECOND STAGE AND 350MM DIA. 1.50 KM FOR GHAZIPUR MINOR CLASS 20 AS PER IS CODE 1592 2003 AND IS CODE 6530 1972
Deploying of Tractor with trolley and driver for the project of river training channelization for the protection of Vill. Baghpur, Mirapur Sadhunangal and other vill. groups from flood and erosion right bank of Ganga River
Deploying Tractor with leveler from chainage 0.1 km to 1.5 km for the project of river training work through channelization for the protection of Village Baghpur, Mirapur Sadhunangal, and other village groups from flood and erosion along the right ba
CONSTRUCTION WORK OF TUBEWELL CIRCLE OFFICE BAREILLY