Loading…
Loading…
524 results • Recent activity
Construction of stone lining and earth work in main canal reach from 1.250 Km to 1.300 Km and T-Point of Rampur Minor and Rampur DY Minor Length 100 Mtr. at Hargarh Ist Pump Canal.
Construction of stone lining and earth work in main canal reach from 0.695 Km to 0.795 Km and 0.800 Km to 0.950 Km at Hargarh Ist Pump Canal.
Construction of stone lining and earth work in main canal reach from 0.425 Km to 0.475 Km and Kashisarpti minor (T-Point) reach from 0.000 Km to 0.040 Km at Hargarh Ist Pump Canal.
All work of laying, commissioning and testing of A.CMAZZA pipeline 800mm reach 3.25 to 3.30 km and M.S. pipeline 800mm reach Km 2.40 to Km 3.25 of the water distribution system of Main Mr under the new Singhvahini Pump Canal Lot-01
All work of laying, commissioning and testing of A.CMAZZA pipeline 800mm reach 3.40 to 3.70 km and AC Mazza Pipeline 500mm reach Km 3.70 to Km 3.80 of the water distribution system of Main Minor under the new Singhvahini Pump Canal.Lot-02
All work of laying, commissioning and testing of A.CMAZZA pipeline 500mm reach 4.20 to 4.40 km and M.S. pipeline 500mm reach Km 3.95 to Km 4.20 of the water distribution system of Main Minor under the new Singhvahini Pump Canal.Lot-03