Loading…
Loading…
515 results • Recent activity
installation of 01 new barge 15x5.5X1.7 m planking covering painting etc. work and dismantling of 02 old dilapidated barges and dismantling of 04 pump sets from the old barge and installing them on the new barge at Gurha Pump Canal
Fabrication Supply and Erection of Structural Steel Shed Frame having Clear span27Mtr and Length 60 m having 13 no of MS Trusses and 26 no of MS Column including all cost of labour Tand P and material for the Completion of work as per Drawing and BOQ
Construction of TCD Varanasi Office above plinth level Ground Floor First Floor and Second Floor as per drawing and BOQ Including all the cost of material T and P and labour but excluding the cost of bricks cement and MS Tarbar
Dismantling and safe shifting of old pump, motor, panels, capacitor and other associated equipments (From pump No. 01 to 10) at Chaudhary charan singh Dalmau A Pump canal stage 1st, Distt. Raebareli
Manufacturing / casting and providing roller of shutter assembly for Kemri barrage rampur F.O.R Bareilly as per BOQ
Painting of Shutter Assembly after Sand Blasting and Apply two coat of zinc Rich Primer and two coat of solvent less epoxy paint for 09 No. gates and Primer and Painting on MS Steel surface of 09 No balance boxes of Kemri Barrage Rampur as per BOQ