Loading
Loading…
Loading…
521 results • Recent activity
C.C. lining For Kanwara Pump Canal Block Badokharkhurd District Banda Lot-2
repair work including CC etc. In second stage of pump canal is being done on the old brick lining of 480 meters from D-tank to trification.lot 7
Repairing of old stone pitching from 0.0 mtr to 465 mtr by CC laying of main canal and repairing D-Tank by cc work and RCR pirching around the D tank etc at Gurha pump canal
Construction of CC lining reach from 0.225 to o.525 km at lamiyari pump canal, block pahari dist. chitrakoot
Dismantling Primary And Secondary HT LT Cable by opening the Terminal Bushing taking out HT LT Cable from each terminal. Again Dismantling LT Transformer 75 KVA