Loading…
Loading…
25 results • Latest
22 - Construction and Recarpeting BT Road at Various Places in Zone 1 in UIT Area Chittorgarh
Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305).
19 - Construction of CC Road at Rambag Colony and Nearby area in UIT Area Chittorgarh
Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). By Mannual Means
20 - Construction of Open Varanda at Dhanet Kalanin UIT Area Chittorgarh
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available : Ordinary rock
21 - Construction of Open Varanda at Meetha Ramji Ka Kheda Araji No 293 in UIT Area Chittorgarh
Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available : Ordinary rock
15 - Construction and Recarpeting BT Road in WardNo. 59, 60 Shiv Nagar Kachi Basthi Ranga Swami in UIT Area Chittorgarh
Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305).
11 - Construction of CC Road Work at Various Places in Gopal Nagar in UIT Area Chittorgarh
Excavation for road work in soil with hydraulic excavator of 0.9 cum bucketc apacityincludingcuttingandloadingintippers,trimming bottom and sides lopes, in accordanc ewithr equirement soflines ,grades andcross-sections ,and transporting to the embankment location with a lift upto1.5m andl ead upto1000 mas per MoRTHSpecification Clause 301.3