Loading…
Loading…
10 results • Latest
Development and Beautification of Sanvidhan Park at Shrinathpuram Kota
Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed: Ordinary rock
Construction of CC Road Drain and Other Miscellaneous Work infront of Rendal Park (Abhyuday Nagar) Dadabari Kota
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202By Mechanical MeansBituminous Courses & Granular Courses
Civil Work
Providing and Applying ACRYLIC emulsion polymer waterproofing chemical coating, on over roof on over roof slabs/terrace/balconies/parapet wall etc.with following method/specification: Paint the surface with regular paint brush so as to obtain approximately 0.3mm thickness coating. apply the 2nd coat next day at right angles to the 1st coat so that total thickness of the coating should be approximately 0.6mm coverage by using above formulation will be 40 ft2/ litre of chemical. painted surface does not require any external water curing since chemical will hold sufficient water for curing.After the primer coat Apply 2 coats of modified acrylic emulsion polymer water proofing compound having solar heat reduction properties coating @ 0.330 KG/SQM on the surface of the interval of 3-4 hours. Undulation on the surface is repair before the waterproofing work.
Civil Work
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil
Construction of CC road Drain and Other Miscellaneous Work infront of Rendal Park (Abhyuday Nagar) Dadabari Kota
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202By Mechanical MeansBituminous Courses & Granular Courses
Construction of road and drains from Aerodrome underpass to ROB and road widening from ROB to DCM along with beautification and horticulture work
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle