TDS03, 04 | Ujjain, Madhya Pradesh · 1d ago Published 26 Aug 2026Construction of Houses And Development of Infrastructure Including External Electrification for Affordable Housing in Partnership Under Pradhan Mantri Awas Yojna 2.0 at TDS No. 03 AND 04 Ujjain M P
MP Works Civil Works - Buildings
239.8 Cr • 16 Sept 20 days left UDA UJJAIN | Ujjain, Madhya Pradesh · 2d ago Published 25 Aug 2026Construction of Proposed Storm Water Drain and Footpath of Block 3 and 4 (Package 9) at Ujjain
MP Works Civil Works - Others
105.3 Cr • 15 Sept 19 days left UDA UJJAIN | Ujjain, Madhya Pradesh · 2d ago Published 25 Aug 2026Construction of Proposed Storm Water Drain and Footpath of Block 1A and 2 (Package 7) at Ujjain
MP Works Civil Works - Others
105.6 Cr • 15 Sept 19 days left UDA UJJAIN | Ujjain, Madhya Pradesh · 2d ago Published 25 Aug 2026Construction of Proposed Storm Water Drain and Footpath of Block 1B (Package 8) at Ujjain
MP Works Civil Works - Others
116.6 Cr • 15 Sept 19 days left NALKHEDA AGAR MALWA | Agar Malwa, Madhya Pradesh · 10d ago Published 17 Aug 2026DEVELOPMENT OF MAA BAGALAMUKHI TEMPLE, NALKHEDA
MP Works Civil Works - Others
68.3 Cr • 8 Sept 12 days left UDA UJJAIN | Ujjain, Madhya Pradesh · 13d ago Published 14 Aug 2026supplying and fixing of traffic retarders at various intersections in kshipra vihar colony Ujjain
MP Works Miscellaneous Works
UDA UJJAIN | Ujjain, Madhya Pradesh · 26d ago Published 1 Aug 2026 Corrigendum 524 Aug → 9 Sept Development of Tourism Infrastructure and Public Experience Zone (Virat Roop) behind PM Ekta Mall
MP Works Civil Works - Others
244.0 Cr • 9 Sept 13 days left UDA UJJAIN | Ujjain, Madhya Pradesh · 27d ago Published 31 Jul 2026 Corrigendum 421 Aug → 1 Sept COMPREHENSIVE DEVELOPMENT OF ANGARESHWAR MAHADEV TEMPLE, UJJAIN
MP Works Civil Works - Others
66.1 Cr • 1 Sept 5 days left UDA UJJAIN | Ujjain, Madhya Pradesh · 1mo ago Published 25 Jul 2026 Corrigendum 414 Aug → 1 Sept Construction of 03 Entry Gates (KALGANANA DWAR UJJAINI DWAR and SIMHASTH DWAR) at Various Locations of Ujjain
MP Works Civil Works - Others
41.5 Cr • 1 Sept 5 days left UDA UJJAIN | Ujjain, Madhya Pradesh · 1mo ago Published 25 Jul 2026 Corrigendum 414 Aug → 1 Sept Construction of 03 Entry Gates (TRISHUL DWAR VIKRAMADITYA DWAR and DAMRU DWAR) at Various Locations of Ujjain
MP Works Civil Works - Others
39.5 Cr • 1 Sept 5 days left