Loading…
Loading…
724 results • Latest
Construction and Maintenance of from L045(Link Road) Shunglipora Sochalpathri Km 2nd to Lone Mohalla Shunglipora Complete P.No Jk02-4020, L.1.68 KM Carriage way width- 3.75 m Under PMGSY IV, Batch I, FY 2026-27, Block Khag PMGSY Div Budgam
Construction and Maintenance of Link Road from L050-(Link Road) L030 Km 5th to Punjabi Mohlla Complete Package No JK02-4021, Length 1.55KM Carriage way width- 3.75 m Under PMGSY IV, Batch I, FY 2026-27, Block KhanSahib PMGSY Division Budgam
Construction and Maintenance of Road L086-(Link Road) Km 2nd Ashan Dhosa road to Neeli-B Package No. JK04-4553, PMGSY-IV, Batch-I of 2026-27, Block-Changa, District Doda Length 2.000 Kms Adv. Cost excl. maintt. but inclusive of GST Rs. 500.82 lacs
Construction and Maintenance of road from L115-(Link Road) km 8th Jib Thathi road to Patta Kotli (Using Waste Plastics), Package No. JK14-4020, PMGSY-IV (Batch-I, 2026-27), Block Udhampur, District Udhampur, (Length - 2.410 km)
Construction and Maintenance of Link Road from Link From Reshnagri To Checki Reshnagri EP To Bakerwal Check Complete P.No JK22-4011, Length 2.1KM Carriage way width- 3.75 m Under PMGSY IV, Batch I, FY 2026-27, Block Ramnagri PMGSY Div Pulwama
Construction and Maintenance of Link Road from Link From Androosa Road Km 2nd RD 500 to Gretbal Complete Package No JK10-4008, Length 1.71 KM Carriage way width- 3.75 m Under PMGSY IV, Batch I, FY 2026-27, Block Pampore PMGSY Division Pulwama