Loading…
Loading…
768 results • Latest
Construction and Maintenance of Road L041-(Link Road)Km 2nd of Bharat Keshwan road to Gujjar Basti-Drumri Package No. JK04-4037, PMGSY-IV, Batch-I of 2026-27, Block-Dali Udhyanpur, District Doda Length 4.000 Kms
Construction and Maintenance of Road from L025-(Link Route) Dung to Kaletar Gorani Package No. JK05-4013, PMGSY-IV, Batch-I of 2026-27, Block-Nagrota, District Jammu Length 5.200 Kms
Construction and Maintenance of Road L059-(Link Road) KM 17th RD 700 NH244 to Ansi via Saldi Package No. JK04-4043, PMGSY-IV, Batch-I of 2026-27, Block-Assar, District Doda (Using Gbion Wall Length-6.700 Kms) Length 6.700 Kms
Construction and Maintenance of Road from L081-(Link Road) Mota Draman (Marta to Lakhod) Package No. JK14-4209 PMGSY-IV, Batch-I of 2026-27, Block-Ramnagar, District Udhampur. (Using Waste Plastics Length-6.725 Kms) Length 6.725 Kms
Construction and Maintenance of Road from L109-(Link Road) Kaldi Barmeen road Km 2nd to Gowari Package No. JK14-4040, PMGSY-IV, Batch-I of 2026-27, Block-Ghordi, District Udhampur (Using Waste Plastics 5.268 Kms) Length 5.268 Kms
Construction and Maintenance of Road from L105-(Link Road) KM 2nd rd100n of khawas-bella road to chital bara via keri Package No. JK12-4516, PMGSY-IV, Batch-I of 2026-27, Block-Khawas, District Rajouri Length 13.000 Kms