Loading…
Loading…
4,554 results • Latest
Construction and Maintenance of road from L085-(Link Road) Mantalai Sira road Km 8th to Karpalt (Using Waste Plastics), Package No. JK14-4057, PMGSY-IV (Batch-I, 2026-27), Block Chenani, District Udhampur, (Length - 2.00 km)
Permanent Restoration of various roads of PMGSY Division Doda (Pls refer e-Nit)
Permanent Restoration of Thathri to Kathawa and Thathri to Cheera by way of Construction of 3.00 Mtr Span RCC Culvert, 4.00 Mt Height RWall, 3.00 Mtr Height RWall, BWall Crated Wall and Pucca Drain.
Notice inviting Quotation (Two Cover System) for preparation of DPR for Rural Roads under CAPEX VVP-II State Fund projects
Notice inviting Quotation (Two Cover System) for preparation of DPR for Rural Roads under RIDF projects
Special Maintenance work affected by flood for construction of road from Chhoto Domohoni School to Jalpesh via Kashiadanga Salbari School with in Saptibari GP under Maynaguri Block in the District of Jalpaiguri, Damaged Length - 0.870 Km
SL-1 (Development of Junctions on NH 31 AT MALLIKSHOVA TO PWD ROAD NEAR DURAMARI under Dhupguri Block in Jalpaiguri District, Package No. WB10-ADB-30)
Special Maintenance work affected by flood for construction of road from Bhangerhat Kalimandir to Pradhan House via PWD Road with in Churabhandar GP under Maynaguri Block in the District of Jalpaiguri, Damaged Length - 0.750 Km
SL-3 (Development of Junctions on T09 AT MAYNAGURI POST OFFICE TO UTTAR MUAMARI VIA DEBI NAGAR JR. BASIC SCHOOL under Maynaguri Block in Jalpaiguri District, Package No. WB1049)
Bidhichandrapur Pry. School to Ranjabar Bazar